Belledune River

Camping ground with trailer and fire pit

Access ramp to river
Belledune 06
Thursday, July 28, 2011

Issue:
Waterfront property with trailer and
acces trail on the right bank or the river. Bank well used with cut vegetation exposed to erosion. Tree removal noted in area with light erosion.
Action Required:
Landowner education on the importance of maintaining an adequate buffer zone on their property. The stream banks should be stabilized in order to slow down erosion and reduce sedimentation in the river.
![]() |
Negligible alteration |
![]() |
Minor alteration. Must follow site |
![]() |
Alteration with possibility of impact |
![]() |
Alteration with impact. Recommended intervention. |
![]() |
Full restoration |
![]() |
incomplete restoration or monitor |
![]() |
Restoration to be completed |