Haché Stream

Metal deflectors downstream

Metal deflectors downstrea

Culvert with cement foundation
Haché 03
Monday, July 19, 2010

Issue:
Big culvert/bridge that is used to cross highway 11. Cement deflectors inside the bridge and metal deflectors downstream to control the flow. Rip-rap rocks on left bank. Small fishing pond downstream from the bridge. Tall grass and shrubs around the culvert and on the left bank.
Action Required:
The stream banks around the culvert should be stabilized in order to reduce sedimentation in the river.
![]() |
Negligible alteration |
![]() |
Minor alteration. Must follow site |
![]() |
Alteration with possibility of impact |
![]() |
Alteration with impact. Recommended intervention. |
![]() |
Full restoration |
![]() |
incomplete restoration or monitor |
![]() |
Restoration to be completed |