Petite rivière aux Ormes

ATV crossing

PR Ormes 05

Tuesday, August 10, 2010

Issue:

ATV trail crossing the river at the hydro line. Steep slope on left bank. Gravel on stream bed. Lots of shrubs around the river.

Action Required:

The approach to a ford can be stabilized using clean crushed rock on top of a geotextile.

Alteration negligible

Minor alteration. Must follow site

Alteration with possibility of impact

Alteration with impact. Recommended intervention.

Full restoration

incomplete restoration or monitor

Restoration to be completed