Aux Ormes River - South Branch

Plastic culverts on private woodlot
South Branch Ormes 06
Friday, August 20, 2010

Issue:
Recently renovated forestry road (by mining company) that crosses the brook with two plastic culverts (2 x 90 cm). Loads of gravel and dirt spread out on the road. Future mine site in the area.
Action Required:
A follow-up is required to monitor the effects of the new mine on the river. The stream banks should be stabilized in order to slow down erosion and reduce sedimentation in the river.
Update
June 30 2017


Vegetation around the culverts

Vegetation around the culverts
Update:
The mine never came into existence and vegetation grew on the banks.
![]() |